Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Chih, Y, Kiazad, K, Zhou, L, Capezio, A, Li, M and D. Restubog, S L (2016) Investigating Employee Turnover in the Construction Industry: A Psychological Contract Perspective. Journal of Construction Engineering and Management, 142(06).

Du, J, Kim, B and Zhao, D (2016) Cost Performance as a Stochastic Process: EAC Projection by Markov Chain Simulation. Journal of Construction Engineering and Management, 142(06).

Jung, M, Park, M, Lee, H and Kim, H (2016) Weather-Delay Simulation Model Based on Vertical Weather Profile for High-Rise Building Construction. Journal of Construction Engineering and Management, 142(06).

Liu, J, Zhao, X and Yan, P (2016) Risk Paths in International Construction Projects: Case Study from Chinese Contractors. Journal of Construction Engineering and Management, 142(06).

Love, P E D, Edwards, D J and Smith, J (2016) Rework Causation: Emergent Theoretical Insights and Implications for Research. Journal of Construction Engineering and Management, 142(06).

  • Type: Journal Article
  • Keywords: Causal ambiguity; Epistemology; Rework; Causation theory; Cost and schedule;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001114
  • Abstract:
    Rework is a chronic problem in construction and engineering projects. A wide variety of studies examining the nature of rework have been undertaken since the seminal research of Burati in the early 1990s, which examined quality deviations. Initial studies focused on identifying the causal factors and costs of rework to quantify the severity of the problem. From these studies, it was recognized that rework causes were interdependent; so techniques such as cognitive mapping (CM) and system dynamics (SD) were subsequently introduced to model the complexity and dynamic of this phenomena. Although such results provided the essential building blocks to better understand and provide the much-needed stimulus for theory development, rework remains a pervasive issue. A number of factors have contributed to the causal ambiguity that presently prevails, which includes the epistemological underpinning used to construct the nature of causes and the subsequent use of tools and techniques that are used for analysis. Evidence of this is presented in recent studies that have failed to acknowledge the interdependency of rework causes as research regressed to identifying those causes of a singular nature. Consequently, such research continues to stymie progress toward reducing and containing rework, and a moratorium on such approaches is suggested. With this in mind, insights into the extant rework literature and causation philosophy are examined and recommendations to improve the understanding necessary to establish a theory for rework causality are proposed.

Lu, W, Zhang, L and Zhang, L (2016) Effect of Contract Completeness on Contractors’ Opportunistic Behavior and the Moderating Role of Interdependence. Journal of Construction Engineering and Management, 142(06).

Shen, X, Marks, E, Pradhananga, N and Cheng, T (2016) Hazardous Proximity Zone Design for Heavy Construction Excavation Equipment. Journal of Construction Engineering and Management, 142(06).

Siu, M F, Lu, M, AbouRizk, S and Tidder, V (2016) Quantitative Assessment of Budget Sufficiency and Resource Utilization for Resource-Constrained Project Schedules. Journal of Construction Engineering and Management, 142(06).

Vashani, H, Sullivan, J and El Asmar, M (2016) DB 2020: Analyzing and Forecasting Design-Build Market Trends. Journal of Construction Engineering and Management, 142(06).

Zhang, S, Zhang, S, Gao, Y and Ding, X (2016) Contractual Governance: Effects of Risk Allocation on Contractors’ Cooperative Behavior in Construction Projects. Journal of Construction Engineering and Management, 142(06).